Most of the images on this page are pretty much self explanitory! Below are photos of the trip made to look at the boat take measurments and pick up the many parts that needed duplication.
Above - Cap Rails
Front Seat back
Back Seat Back
Back Seat Bottom
We also helped sort out the ceiling boards and their placement in the boat!
One of the sealing boards needed repair on the end.
You guessed it we also helped sort out the floorboards and their placement in the boat!
These are two air ducts used to force air down to the bottom of the bilge to push out heavier than air gasoline fumes!
All the parts in need of mahogany for duplication laid out on the rough sawn wood they would be cut from.
1
1
1
2
2
2
2
3
3
4
4
5
5
5
5
The structrual member at right was duplicated and installed below the covering board on the starboard side
6
6
7
7
8
8
9
9
10
10
Visual Record of parts sent to be chromed and re-chromed
All cosmetic work was completed by another restorer after we supplied all the wood replacement parts and went down on site to complete the wood installation.